ISO 9001 Implementation requires that employees be trained in the standard. Over the years I have done many training sessions in the standard. These sessions typically take one to two days to conduct. After a few hours going through the standard, I find students eyes glossing over. Either I or the material tends to put people to sleep. In short I don't believe that a one or two day training session is particularly effective.
To address this training effectiveness issue, I have been developing PowerPoint presentations on specific elements of the standard. The idea is that a segment can be covered completely in an hour or less, and can keep people's attention long enough to retain the material. It also makes sense to train in an element as implementation of that element is about to start.
At www.rosehillsystems.com, in the Tools section, you will find a link these presentations. They cover various elements of the standard with some added insight into implementation. At this point there are a dozen or so presentations. I will be adding to these presentations over time, so check back periodically.
Sunday, June 2, 2013
Tuesday, May 28, 2013
Product Realization Planning
Product realization is
the ISO 9001 term for product and /
or service provision. ISO 9001 section
7.1 states that: “The organization shall plan and develop the processes needed
for product realization.” A quality plan
involves the following:
- Quality objectives
- Product requirements
- Documented processes
- Resources needed to produce, monitor and test the product
- Required verification, inspection, monitoring and measurement procedures
- Records needed to show that the processes and the resulting product meet requirements
Quality objectives should be consistent with the
organization’s quality objectives.
Product requirements must be consistent with the outputs of the design
process.
Documented production processes are not required,
but it is a good idea to document how the processes that produce the product
interact. A flow chart is a good way to
show how the manufacturing of the product will occur and where the inspection points will be. Documented inspection procedures which
describe the product requirements, the inspection methods and tooling to be
used, and the frequency of inspection assure a consistent inspection process.
Once the production processes are determined, it should be
easy to determine the resources needed to create the product including:
- Manufacturing equipment
- Tooling
- Personnel needed to perform the work and do the inspection
- Inspection equipment and procedures
- Records needed
Inspection records are required. The organization must be able to show that
the product meets requirements, and the way to do this is to record inspection
results. Records should show the
features inspected, the specification for each feature, the values obtained, the
gauge / tool number used to perform the inspection, the inspector, and the date
/ time of inspection. Inspection records
can be a critical input to corrective actions, and analysis of data necessary
for continual improvement.
Thursday, May 2, 2013
On-site Supplier Audits
In my recent post in March on Supplier
Evaluations, I addressed supplier self-assessment questionnaires. Questionnaires are good, but sometimes it is good
to visit the customer. What should one
do when on-site at the supplier?
A client recently asked me how to conduct an on-site process
audit of a supplier. He was visiting the
supplier anyway, so it made sense to him to conduct a process audit while there.
When doing such an audit, I like to start with known
purchase orders (open and closed) and follow those orders from the point where
the PO is received by the supplier to the point where the product ships. Asking the supplier to retrieve records about
a closed order also helps to assess the supplier’s record keeping.
To assist the client, I came up with 10 areas of
questioning. The questions follow a
customer purchase order through the sales order, design, procurement,
production and inspection processes.
They offer a pretty good idea about the supplier’s processes and how
well aligned with the standard they are.
Such an audit can be conducted in a couple of hours and give a pretty
good idea of the supplier’s compliance with ISO 9001 requirements.
You can find the questions here
, in the advice section of my web site.
For questions, or additional information, visit www.rosehillsystems.com.
Saturday, April 13, 2013
Training Requirements
ISO 9001 Section 6.2.2
Competence, training and awareness identifies five requirements:
Finally, for those senior managers who believe that training is unnecessary, or a wasteful expense, I offer this question: How many incompetent people do you want working for you?
For more information visit www.rosehillsystems.com. In the tools section you will find some PowerPoint presentations that can be used as a basis for ISO 9001 training. Steal shamelessly.
- Determine necessary competence
- Provide training
- Evaluate training given for effectiveness
- Assure that personnel are aware of the relevance of their work
- Maintain training records
- Consider creating job descriptions. Job descriptions identify the skill set a qualified employee must possess to perform the functions of the job. Larger companies have them because they are used as a mechanism for determining the value of, and hence the wages paid for each job, but they also identify the training requirements for the employee.
- With a job description in place, it is easy to do a gap analysis for an employee to determine what additional training he or she should be offered. Some training must be provided to all employees, and some training must be repeated periodically. Safety training is an example of training that in many cases is required to be given periodically. Most employees are not skilled in the requirements of ISO 9001, or quality in general, so some form of general quality training is normally required for all employees.
- There are many ways to evaluate the effectiveness of training. One way is a periodic performance review. These are usually attached to pay increases, and, done properly; they also identify skills weaknesses that can be corrected by additional training. Perhaps the most effective method of determining training effectiveness is testing.
-
Employees want to do a good job. They know how to perform the tasks of the job and usually do it consistently well. But many manufacturing employees have no idea how what they are making or how the product they are making will be used. Explain to employees how the work they perform affects the quality of the products and services the organization supplies, and what the product does for the customer.
Not explaining how the organization’s products are used can have unintended consequences. The Space Shuttle booster rockets were stored in a dry nitrogen environment prior to use. A component we produced helped circulate nitrogen in the storage container. We all watched the launch of the Challenger. When the Challenger space shuttle exploded on takeoff, the employee who assembled this component started crying because she believed that the product she produced had failed and caused the explosion. Of course this was not the case. - Each employee should have a training plan. A training plan outlines the training that a person is required to have. The training plan should be in alignment with the job description, and any other company or regulatory requirements for training. ISO 9001 requires that records of training performed be maintained. Training records can be compared to the required training and used to identify any required training which needs to be performed.
Finally, for those senior managers who believe that training is unnecessary, or a wasteful expense, I offer this question: How many incompetent people do you want working for you?
For more information visit www.rosehillsystems.com. In the tools section you will find some PowerPoint presentations that can be used as a basis for ISO 9001 training. Steal shamelessly.
Saturday, March 23, 2013
Nonconforming Product
ISO 9001
section 8.3 Control of nonconforming product states: “The organization shall
ensure that product which does not conform to product requirements is
identified and controlled to prevent its unintended use or delivery.” The standard requires that a specific
procedure be written that describes how nonconforming product is controlled.
Simply put, the standard is saying: Don’t mix the good stuff
with the bad stuff. Defective material
should be placed in an area specifically designated for nonconforming product. That area should be segregated from good
product and specifically labeled as nonconforming product.
The product placed in that area must be labeled, and its
nonconformances identified. It is common
for organizations to generate a report that identifies and describes the
defective product. These reports go by
many names such as Discrepant Material Report (DMR), Nonconformance Report
(NCR), etc. They typically identify the
product, the discrepancy or discrepancies, and the number of pieces
involved. The form is also used to
identify the actions taken, who authorized the actions, and what the final
disposition of the material was. The
standard allows the following actions:
- Rework the product to specification
- Use as is (“authorizing its use, release or acceptance under concession”)
- Scrap
- Re-grade for some other purpose
My personal opinion is that ‘Use as is’ should be avoided if
at all possible. It has the following
problems:
- An inferior product is gets shipped to customers
- A message is sent to employees that defects are acceptable
When product is reworked, it must be inspected for the
defect originally identified.
The discrepancy report, indicating the actions taken and the
final disposition is a record which must be maintained. Periodically records of nonconforming product
should be analyzed. Analysis might
identify possible preventive actions that could reduce nonconformances in the
future.
For more information visit www.rosehillsystems.com .
Thursday, March 14, 2013
Supplier Evaluations
ISO 9001
section 7.4.1 states: “The organization shall evaluate and select suppliers based
on their ability to supply product in accordance with the organization’s
requirements. Criteria for selection,
evaluation and re-evaluation shall be established. Records of the results of evaluations … shall
be maintained.”
Some customers use site visits to assess the capabilities of
the supplier, but ISO 9001 does not specifically require this practice. Most customers send potential suppliers a self-assessment
questionnaire. Self-assessment
questionnaires can be simple or complicated to complete. Be aware that the likelihood of receiving a
response to a questionnaire is inversely proportional to the questionnaire’s
complexity.
I’m not in favor of complicated multi-page
questionnaires in most cases. If the organization
intends to place a small order with a supplier it is not likely to use often,
it is unlikely that a complex questionnaire will be returned in a timely
manner, if it is returned at all. A
simple, short questionnaire is more likely to be completed and returned.
If the supplier is to be a key supplier with a significant
business opportunity, and a likely long term business arrangement, it may be
better to visit the supplier and complete a complex questionnaire yourself in
an on-site audit. Meeting the players
creates a better, more lasting relationship with the individuals involved. These relationships make problem solving over
the phone or by e-mail more likely to be successful. As to what questions to ask, Govind Ramu
presents an interesting perspective, in the Expert Answers section of Quality Progress March, 2013 where
he addresses questions to ask and not to ask a supplier.
Consider establishing (and documenting) multiple criteria
any of which will qualify the supplier.
Examples might be:
·
ISO 9001 certified
·
Over one year experience with the supplier with
few product rejections
·
Franchised supplier (for distributors)
As you collect supplier qualification data, consider storing
the responses in a database. The
database facilitates contacting suppliers when quality problems arise and
provides a tool for re-evaluating the supplier.
I recommend contacting the supplier near the time when his certification
expires, and if it is not certified, annually.
A database can facilitate and automate this work.
Key suppliers, those suppliers who get most of your
business, should be rated by some rating system routinely. The ratings should be fed back to the
supplier. Examples of such ratings might
be:
·
On time delivery percentage
·
Number of lots rejected divided by the number of
lots received.
·
A multiple of the two above.
Sunday, March 10, 2013
Preventive Action
Preventive Action
Many get confused with corrective and preventive
actions. While corrective action deals
with existing nonconformances (defects), preventive actions deal with nonconformities
that haven’t occurred, but might occur in the future.
In section 8.5.3 Preventive Action, ISO 9001 states “The
organization shall determine action to eliminate the causes of potential
nonconformities in order to prevent their occurrence.” Potential problems are usually identified
from the analysis of metrics, or from audits.
For example, an organization has a metric for on time
delivery, and will take corrective action when delivery falls below 95% on
time. The metric is above the limit, but
examination of the metric chart shows that on time delivery has decreased each
month for the past 5 months. A
corrective action is inappropriate because the metric hasn’t fallen below the
requirement (95%). In this case,
preventive action is more appropriate.
Whereas corrective action requires that action be taken,
preventive action does not. Consider a
control chart for a machine tool. The
chart indicates that the tool is wearing and may need to be replaced soon. Do we change the tool now or wait until the
control limit is exceeded? An economic
analysis might suggest that we wait for the control limit to be exceeded because
the cost of the tool is high or the cost of lost production is high. The customer
may be in critical need of the product and we can’t afford to shut down the
machine now. A decision to continue
production would close the preventive action.
A decision to take
action would allow the machine tool to continue operation while a plan is
developed for implementing a replacement.
In contrast, if this were a corrective action, the tool would be shut
down until a replacement is available.
Once the decision to take preventive action has been made,
the process becomes very similar to corrective action. An action is selected, usually by a
team. A plan is developed to implement
the preventive action selected, and the implemented action is monitored for
effectiveness.Some organizations use one form for both preventive and corrective actions. In the case of a preventive action, there is no evidence of nonconformance, and there is no containment plan, since a nonconformance has not occurred. Root cause analysis still occurs because there may be many choices of actions to take.
When the action(s) have been identified, a plan for
implementation is developed.
My steps of preventive action look like this:
1.
Problem statement
a.
State the requirement
b.
State the evidence of potential nonconformance
2.
Root cause analysis
3.
Preventive action plan
a.
What action(s) will be taken? NOTE: The plan might be to do nothing.
b.
When will they be implemented?
4.
Follow Up
a.
Were the actions taken effective?
1.
Problem Statement
a.
State the requirement
b.
State the nonconformance
c.
State the objective evidence of the
nonconformance
2.
Containment Plan
a.
When did the problem start?
b.
What are we doing to control the bleeding while
we are looking for a solution ( short term fix)
3.
Root Cause Analysis
4.
Corrective Action Plan
a.
What will be done to eliminate the root
cause(s)?
b.
When will they be implemented?
5.
Follow Up
a.
Was the implemented corrective action effective?
b.
Was the short term fix removed?
Subscribe to: